Commissioning can be done by TUBA Turbine in cooperation with the manufacturers. Also possible Warranty for operation and sercive contract.
Commissioning can be done by TUBA Turbine in cooperation with the manufacturers. Also possible Warranty for operation and sercive contract.
Baujahr | installed 2004 and operation 10/2005 |
MW | 180 |
Type | Frame 9E |
Ref-Nr. | GT 393 |
Elektrische Leistung | Gasturbine 125 MW, Steam Turbine 55 MW |
Brennstoff | LFO and NG |
Frequenz | 50 Hz |
Laufzeit | 2000 Stunden |